PE-18(1): Facility Site
Control Family:
Parent Control:
CSF v1.1 References:
Baselines:
(Not part of any baseline)
Control is withdrawn in the next version of this control set and incorporated into: PE-23: Facility Location.
Control Statement
The organization plans the location or site of the facility where the information system resides with regard to physical and environmental hazards and for existing facilities, considers the physical and environmental hazards in its risk mitigation strategy.