CP-9(2): Test Restoration Using Sampling
Control Family:
Parent Control:
CSF v1.1 References:
PF v1.0 References:
Baselines:
- High
- OT High (SP 800-82r3)
Previous Version:
- NIST Special Publication 800-53 Revision 4:
- CP-9(2): Test Restoration Using Sampling
Control Statement
Use a sample of backup information in the restoration of selected system functions as part of contingency plan testing.
Supplemental Guidance
Organizations need assurance that system functions can be restored correctly and can support established organizational missions. To ensure that the selected system functions are thoroughly exercised during contingency plan testing, a sample of backup information is retrieved to determine whether the functions are operating as intended. Organizations can determine the sample size for the functions and backup information based on the level of assurance needed.
OT Discussion
Testing for reliability and integrity increases confidence that the system can be restored after an incident and minimizes the impact associated with downtime and outages. The ability to test backups is often dependent on the resources needed to appropriately represent the environment, such as the availability of spare devices and testing equipment. Testing backup and restoration on OT is often limited to systems with redundancy or spare equipment. In certain cases, sampling will be limited to those redundant systems. Compensating controls may include alternative methods for testing backups, such as hash or checksum validations.